Industrial Site Selection & Test Fit…

isn’t a simple task, especially if you don’t have real estate experience; here’s what to cover.

Industrial site selection is a crucial process for businesses looking to establish or expand their facilities. The objective is to find a location that optimizes logistics, minimizes costs, and meets operational requirements. A test fit is a detailed evaluation that helps ensure that the selected site can meet the specific needs of the business before making a commitment.

Here’s a breakdown of the industrial site selection process, and how a test fit plays a role:

1. Initial Site Selection

The process starts with identifying potential sites based on general criteria such as:

  • Location: Proximity to suppliers, customers, and transportation networks (e.g., highways, railroads, ports).
  • Zoning: Ensure the site is zoned for industrial use.
  • Cost Factors: Land costs, tax incentives, and overall cost of operations (including utilities, labor, and local taxes).
  • Infrastructure: Availability of utilities like electricity, water, sewage, and broadband

2. Detailed Evaluation

After shortlisting potential sites, a more detailed evaluation is conducted. Factors to be considered include:

  • Size and Topography: Ensure the site is large enough to accommodate facilities, parking, storage, and future expansion. Check terrain, soil conditions, and any potential challenges like wetlands or flood zones.
  • Environmental Considerations: Understand any environmental regulations, risks of contamination, and need for remediation.
  • Labor Market: Assess the availability and cost of skilled labor in the area
Img Up Siteinfographic

List of questions and checklist

3. Test Fit

Once a promising site is found, a test fit involves creating a conceptual layout for the site to ensure it meets operational requirements. This step typically includes:

  • Building Layout: Mapping the facility layout on the land, including warehouse space, production areas, and office spaces.
  • Circulation and Flow: Ensuring efficient flow of goods, raw materials, and employees, including transportation routes for trucks, loading docks, parking, and pedestrian pathways.
  • Compliance with Regulations: Ensuring that the proposed layout complies with local building codes, safety regulations, and environmental standards.
  • Utility Placement: Positioning of utilities like power, water, and sewer connections relative to the planned building locations.

4. Financial Analysis

Alongside the test fit, a detailed financial analysis should be done, which could include:

  • Cost of Development: Budgeting for land acquisition, construction, and fit-out costs.
  • Operating Costs: Estimating long-term operational costs like utilities, transportation, and labor.
  • Return on Investment: Ensuring the chosen site and layout provide a viable return on investment for the business.

5. Risk Management

The test fit should also help assess risks like:

  • Potential delays due to environmental remediation or permitting issues.
  • Long-term suitability of the site for evolving business needs.
  • Community or regulatory challenges.
Screenshot 2024 10 18 092024

6. Decision Making

After completing the test fit and analysis, the final decision can be made regarding whether to proceed with the site or explore alternative locations.

A test fit is a crucial component of the industrial site selection process as it confirms whether the site can meet the specific physical, operational, and regulatory needs of the business before significant resources are committed.

need more info? get in touch